Project Description:

Coverage of the drain nashart within the city of Qaleen from kilo 6,865 to kilo 6,965 with a length of 100 m Box culvert coverage with groundwater dewatering and taking the necessary measures to protect the facilities adjacent to the drain, and the project aims to reduce pollution with beautification and development of the area around Qaleen Central Hospital.

Client: National General Contracting & Supplies Co.

Project Status: ongoing

Project Description:

  • chain (Group A)

The total length of the canals is 35 km wild Series A. Lining using plain concrete clad rubble in most canals Lining using reinforced concrete with some canals.

  • chain (Group B)
The approximate total length of canals is 33.6 km wild series B. Lining using plain concrete clad rubble in most canals Lining using reinforced concrete with some canals.

Client: National General Contracting & Supplies Co.

Project Status: ongoing

 

Project Description:

The dam contributes to the protection of oases in the New Valley Governorate from the risk of floods and to optimize the use of water in the fourth spillway for use in agriculture purposes and increases the storage capacity of the area of Al-Mafayd to 80 billion cubic meters of water.
The dam consists of formations of impermeable water drainage soils coated with a layer of 6-tooth stones and a layer of artificial fabric other rubble buildings. The dam has at the bottom two pipes each with a diameter of 2 m with gates to control the passage of water. The level of the top of the dam is 164 m and the highest pipes are at the level of 147 m and Dam dimensions (length 500 m width at the bottom 110 m width at the top 16 m height 17 m)

Client: National General Contracting & Supplies Co.

Project Status: ongoing

Project Description:

The projects of the National Infrastructure for the Development of North Sinai include the construction of freshwater intakes, pipe networks and basins in order to provide fresh water necessary for the cultivation of North Sinai

Fresh water outlet No. 10 on the right land of Sheikh Jaber Al-Sabah Canal at kilo 43.500
The pump station has 6 pumps each operating 82. m3/s to irrigate 11840 acres divided into 28 pieces, ranging in size from 200 to 600 acres.
The project consists of a pump station, transformer rooms, an absorbing basin from the outlet, the supply and installation of mechanical and electrical tasks for the pump station and the electrical transformer station, connecting and connecting the expulsion pipes and main pipelines and their inclusions with the basins.

Client: National General Contracting & Supplies Co.

Project Status: ongoing

Project Description:

The projects of the National Infrastructure for the Development of North Sinai include the construction of freshwater intakes, pipe networks and basins in order to provide fresh water necessary for the cultivation of North Sinai

Fresh water outlet No. 24 on the left mainland of Sheikh Jaber Al-Sabah Canal at kilo 81.500
The pump station has 6 pumps that dispense each pump 75. m3/s to irrigate approximately 10,000 acres divided into 24 pieces, ranging in size from 200 to 600 acres.
The project consists of a pump station, transformer rooms, an absorbing basin from the outlet, the supply and installation of mechanical and electrical tasks for the pump station and the electrical transformer station, connecting and connecting the expulsion pipes and main pipelines and their inclusions with the basins.

Client: National General Contracting & Supplies Co.

Project Status: ongoing

Project Description:

Engineering consultancy works on the implementation and management of the rehabilitation project of canals and branches in the irrigation engineering east of Beni Suef with a length of 99km 42 canals with a total length of 99km.
Lining with rubble covered with ordinary concrete. Lining some parts with reinforced concrete

Client : National General Contracting & Supplies Co.

Project Status: ongoing

Project Description:

Engineering consultancy works on the implementation and management of the project of constructing 10 ground tanks, (10) + (2) ground tanks in Wadi Al-Jarafi Nakhl Center Approximate storage capacity = 4500 cubic meters

Construction of Wadi um al-Bared Dam / Establishment of an artificial lake / Strengthening and rehabilitation of existing dams in Wadi Al-Jarafi

1- Rehabilitation and consolidation of 4 dams in Wadi Al-Jarafi Total storage capacity 1.2 M3

2-Implementation of a lake and 5 calming basins in the Awlad Ali area in North Sinai Governorate
The storage capacity of the lake and basins is 1.5 million cubic meters.

3-Implementation of um Al-Bared Dam Length 255 meters and a height of 10 meters And the width from the bottom is 64 meters and from the top 8 meters Earthen barrier with a length of 700 m and a height of 4 m

Client : National General Contracting & Supplies Co.

Project Status: Completed

Project Description:

Construction of an Irish crossing in the city of Abu Rudeis on the coastal road tunnel – Sharm El-Sheikh
Construction of an industrial canal with a length of 6 km to drain the Wadi Baabaa torrent.

  • Irish crossing in Wadi Baabaa

The total length is 600 m wide as the coastal road Reinforced concrete length 350 m Asphalt length 250 m Cladding rubble with mortar to protect the crossing 12500 m3.

  • An artificial channel for the drainage of torrential water Bawadi Baabaa

Length 6 km, Width 30 m, Height 3 m

Client : National General Contracting & Supplies Co.

Project Status: Completed

 

Project Description:

Establishing 6 artificial lakes with the aim of receiving and storing torrential water to increase the water underground reserve, and the average approximate total storage capacity is 20 million m3.
Construction of 11 dams of graded aggregate with coverage of the layer of buildings of the dish in mortar, to protect against floodwater, and the average approximate total storage capacity is 8 million m3.
Rehabilitation of 3 cumulus dams and raising their efficiency.

client : National General Contracting & Supplies Co.

Project Status: Completed

Project Description:

The first phase: a complex stops above the Marioutia Canal to transfer the service waiting areas from the road with a capacity of 220 services. Making a tourist walkway and rehabilitating the Marioutia Canal with a length of 2.8 km. The second phase: the work of a tourist walkway and the rehabilitation of the Marioutia Canal with a length of 0.65 km.
the project First and second stages: Box culvert cover with a length of 200 m.t Reinforced concrete piles. Box culvert with a length of 200 m. Concrete slabs. Security rooms and bathrooms. Fence for the stand. Security Cameras Lighting poles for the parking lot and the railing. Waiting seats for passengers. Bumps in the opposite traffic and electronic gates Rain drainage rooms.

client : National General Contracting & Supplies Co.

Project Status: Completed

Project Description:

Implementation of the construction of 2 artificial lakes + earthen barrier to protect Naga Karnak / construction of 2 obstruction dam to protect Naga Umrah to protect against the dangers of floods in Qena Governorate

Dam No. (1) Obstruction Dam to protect Nagaa Al-Umrah in Qena Governorate – storage capacity 350 thousand m3

Dam No. (2) Obstruction Dam to protect Nagaa Al-Umrah in Qena Governorate – Storage capacity 100 thousand m3

Construction of an artificial lake (B1) and an earthen barrier to protect Naga Karnak – storage capacity of 2 million m3

Construction of an artificial lake (B2) and an earthen barrier to protect Naga Karnak – storage capacity of 1.4 million m3.

Client: National General Contracting & Supplies Co.

Project Status: Completed

Project Description:

Construction of 3 artificial lakes in Wadi Hawashia with mudbled earthen barriers to reserve and store 5 million m3 of flood water and the construction of a steering barrier with a length of 11300 m to protect the city of Ras Ghareb and Hurghada Road

Construction of an artificial lake B1 in Wadi Safaga with a mudbash earthen barrier with a storage capacity of 1.5 million m3

client: National General Contracting & Supplies Co.

Project Status: Completed

Project Description:

Construction of a lake B1 (length 1 km, width 400 m, depth 6 m) with a storage capacity of 4 million m3

Construction of a steering barrier 1 (length 2.2 km, width 120 m, height 11 m)

Construction of a guide barrier 2 (length 6 km, width 100 m, height 6 m) Construction of a guide barrier

Client:  National General Contracting & Supplies Co.

Project Status: Completed

Project Description:

Construction of 2 cumulus dams – Construction of 5 artificial lakes – Construction of 3 artificial channels with a total storage capacity of 6.5 million m3 of flood water

  • Wadi um Lasifa Dam – storage capacity 300 thousand m3
  • Dam (1) – Wadi Al-Quwaih – storage capacity 600 thousand m3
  • Lake B11 – Wadi Al Quseir – storage capacity of 1.5 million m3
  • Lake B3 – Wadi Al Nakhil – Storage capacity 800 thousand m3
  • Industrial Canal – Wadi Al-Ambji
  • Lake B2 – Sub-Valley – storage capacity 100 thousand m3
  • Lake B1 – Wadi Al-Qusayr – storage capacity 30 thousand m3
  • Industrial Canal – Wadi Al-Quwaih

Client : National General Contracting & Supplies Co.

Project Status: Completed

 

en_USEnglish