Project Construction of 10 Ground Reservoirs / Dams – North Sinai Governorate

Project Description:

Engineering consultancy works on the implementation and management of the project of constructing 10 ground tanks, (10) + (2) ground tanks in Wadi Al-Jarafi Nakhl Center Approximate storage capacity = 4500 cubic meters

Construction of Wadi um al-Bared Dam / Establishment of an artificial lake / Strengthening and rehabilitation of existing dams in Wadi Al-Jarafi

1- Rehabilitation and consolidation of 4 dams in Wadi Al-Jarafi Total storage capacity 1.2 M3

2-Implementation of a lake and 5 calming basins in the Awlad Ali area in North Sinai Governorate
The storage capacity of the lake and basins is 1.5 million cubic meters.

3-Implementation of um Al-Bared Dam Length 255 meters and a height of 10 meters And the width from the bottom is 64 meters and from the top 8 meters Earthen barrier with a length of 700 m and a height of 4 m

Client : National General Contracting & Supplies Co.

Project Status: Completed