Project Description:

The project will start from Gedaref city to Samsam Um El Khair with length of 145 Km & width of 7 m, plus construction of group of box & pipe culvert & one bridge permeates. This way to protect the road from flood waters. The project scope includes and not limited to earth work, subbase, base course & surfacing, structures Included (Concrete Box Culvert & reinforced Concrete Bridge).

Client: Nasr General Contracting Company

Project Status: Completed

Project Description:

The project starts from New Tokar city to Garora city to link the cities of the East African coast to one another, with length of 180 km & width of 10 m, Plus sets of service roads with total length of 13 km. The project scope includes and not limited to earth work, subbase, base course & surfacing, structures Included (Concrete Box Culvert & reinforced Concrete Bridge).

Client: Nasr General Contracting Company

Project Status: Completed

Project Description:

DAMAC Properties is developing Garden Heights; located at New Cairo as a unique mixed use development built on 1,500 feddans with a total built-up area of 4,865,069 m². The work is planned to be completed (12) months after the project Commencement Date, including the durations for procurement, excavation works, backfilling works, storing and grading works. The Construction site is divided into four main phases. Each phase will be laid out as an arrangement of strips each with a 50 m offset.

Client: The Arabian Company for Building and Construction

Project Status: Completed

Project Description:

The project comprises the Construction of National Ring Road to connect Badr City with 10th of Ramdan City Phase 1 through; 2 main roads (20 km each), 4 Crossing Bridges, 1 Crossing Tunnels, and all associated utilities, infrastructure and finishing.

Client: Nasr General Contracting Company and supplies

Project Status: Completed

Project Description:

The project comprises the transfer of the existing road to a free way from km 76 to km 101 with total length of 25 km; consisting of 2 main roads, 2 service roads, 3 crossing bridges, associated utilities and infrastructure.

Client: Nasr General Contracting Company

Project Status: Completed